Don't miss our deal of the week!

Join our email list! Click here.

Questions? Call us 1-800-356-5221 1-800-356-5221

    ResMed Power Station (RPS) II Battery (No DC Cable) with S9 Series Charging Adapter (PSU)




    Have a question? Call us!

    1-800-356-5221 Mon-Fri 8AM-8PM CST,
    Sat 8AM-5PM CST

    Product Overview

    Affected by the power outages in California? We're here to help. Give us a call to help make sure you can continue therapy.

    The ResMed Power Station (RPS) II (No DC Cable) is a long-life, lithium-ion battery by ResMed that can be used to run the S9 and AirSense 10/AirCurve 10 lines of machines. It is suitable for travel and meets IATA transportation regulations. Included with this purchase is the S9 series PSU adapter to charge the battery using the S9 Machine Power Supply. If needed, purchase the appropriate DC power cords or the AirSense 10/AirCurve 10 Power Unit Supply separately.

    Manufactured by ResMed.

    Product Features

    This product is not currently available for expedited shipping within the continental U.S. Regular ground shipping will be the only option. Other options may be available for non-continental U.S. residents.

    The ResMed Power Station (RPS) II (No DC Cable) includes the quick-charge lithium-ion battery and the S9 power supply adapter. The battery is designed to reach a 95% charge in less than four hours. Use this single battery during power outages and vacations or add a second battery for double the run time. As the battery runs low, the user will be notified by visual and audible alerts.

    Features

    • Battery Meets IATA Transportation Regulations
    • Lithium-ion Battery
    • Charges to 95% in Under Four Hours
    • Informational Battery Charge Display
    • Audible & Visual Re-charge Alerts
    • Optional Battery Coupler Joins Two Batteries to Extend Run Time
    • Travel Bag
    • Home, Travel, or Hospital Usage

    Lithium-ion Battery

    The long lasting, lithium-ion battery in the RPS II meets transportation regulations as set by the International Air Transportation Association (IATA). Depending on the machine, use the External Power 90 Watt Supply for ResMed S9 Series CPAP and BiPAP Machines or the External 90 Watt Power Supply for ResMed AirSense™ 10 and AirCurve™ 10 Series CPAP and BiPAP Machines that comes with the machine to charge the battery. The RPS II battery charges quickly and reaches 95% of the charge in less than four hours when starting at 0% charge.

    The ResMed Power Station II's battery charge display indicates the charge level and offers both visual display and audio alert to notify when the charge is low. The audio alert may be muted. Use the voltage output selector on the back panel of the RPS II to change from 24v to 26v power. Note: All S9 and AirSense™ 10/AirCurve™ 10 devices require 24v.

    Double the Batteries to Double the Run Time

    The RPS II has the unique feature of the Battery Coupler for ResMed Power Station (RSP) II which connects two ResMed Power Station II Batteries in series. The Battery Coupler automatically switches from one battery to the other when needed. The Battery Coupler Kit for ResMed Power Station (RSP) II includes both the Battery Coupler and a Velcro Strap for ResMed Power Station (RPS) II to secure the batteries to one another. Additional RPS II Batteries may be purchased separately.

    Travel Bag

    Use the access panel to connect an appropriate DC cable to connect an S9 or AirSense™ 10/AirCurve™ 10 machine for use or to connect the appropriate PSU Adapter to connect to an S9 or AirSense™ 10/AirCurve™ 10 power supply for charging.

    Compatible S9 ResMed Machines

    Please Note: In order to use this battery with an S9 machine the S9 Series DC Cable for ResMed Power Station (RPS) II is required. It can be purchased separately or consider the bundled Resmed Power Station Battery Kit for S9 Machines .

    Compatible Airsense 10 & AirCurve 10 Machines

    Please Note: In order to use this battery with an AirSense 10 or Aircurve 10 machine, the AirSense™ 10 and AirCurve™ 10 Series DC Cable for ResMed Power Station (RPS) II is required. To charge the battery, the Power Supply Unit (PSU) Adapter for AirSense™ 10 and AirCurve™ 10 Machines for ResMed Power Station (RPS) II must be purchased in order to use the AirSense™ 10 and AirCurve™ 10 machine's power supply.

    Non-Compatible Machines

    The ResMed Power Station RPS II will not work the following machines:

    • S8 VPAP™ Auto
    • All S8 Series CPAP machines
    • All non-S9 ResMed machines, unless listed as compatible above
    • All non-ResMed CPAP or BiLevel machines
    • All CPAP or BiLevel machines not listed as Compatible above

    Battery Run Time

    Battery run time varies greatly based on the machine used, the pressure setting and whether or not a humidifier or heated tube are used. A ResMed S9 CPAP machine set at a pressure of 10 cmwp without a heated humidifier has an estimated run time of 13 hours. Using a heated humidifier or heated tubing greatly reduce the run time of the battery. Please reference the ResMed Battery/Device Compatibility List for more information on battery run time.

    Please contact CPAP.com with questions. Call toll free: 1-800-356-5221 or email to cpap@cpap.com.


    Return On Warranty Issues Only

    Specifications

    This Product Includes...

    • ResMed Power Station II Battery
    • Carry Bag
    • Power Supply Unit (PSU) Adapter

    Product Specifications

    The equivalent lithium content of a single RPS II battery meets requirements for safe travel as set by the IATA.

    • Battery Pack Bag Dimensions: 11.25 in L x 7.5 in W x 4.5 in H
    • Battery Dimensions: 9.06 in L x 4.96 W x 1.02 H
    • Weight - Battery Pack Alone: 2 lbs
    • Battery Amp Hours: 8 Ah
    • Charging Time: 4 Hours
    • Battery Warranty: 6 Months
    • Shelf Life of Charge: Up To 3 Months
    • Recharging Requirement: Battery MUST Be Recharged Every 3 Months To Maintain Functionality
    • Battery Life: 500 Charging Cycles
    • Input Voltage: 100-240V

    CPAP.com always offers these services:

    • 8 am to 8 pm CST Toll Free Phone and Email Support
    • 24 hour access to our CPAPtalk.com Support Forum
    • Learning Center for information on sleep apnea and cpap equipment
    • Consumer Purchasing Trends Reports
    • Warranty Services for all items purchased through CPAP.com
    • Insurance Compliant Invoices
    • Free Prescription Request System

    Manufacturer Note

    • Some product images supplied by ResMed © ResMed 2010 Used with Permission.
    • ResMed products are for sale only to patients within the U.S. and not to other third parties or businesses.
    • All services provided by CPAP.com, including advertisement, ordering, sale, delivery, instruction, and setup of the products are performed solely by CPAP.com and independently of the manufacturer.

    Important Tips

    "justify"="">

    User Manual:

    The user manual included with this battery can be viewed and downloaded here: Power Station User Guide.

    ResMed FAA Compliance Letter: To view the ResMed FAA Compliance Listing click: HERE.

    PSU Location

    The PSU adapter is found in a narrow mesh section between the bag shoulder strap and manual in the top flap of the carry bag. The PSU will need to be slid out to be used.

    Please note: The RPS II has a voltage output selector on the back panel of the unit which can be used to change from 24v to 26v power. All S9 and AirSense™ 10/AirCurve™ 10 devices require 24v with and without the use of a humidifier.

    The included Power Supply Unit (PSU) Adapter for ResMed Power Station (RPS) II is NOT used to operate the RPS II. During use, the S9 Series DC Cable for ResMed Power Station (RPS) II connects directly between the RPS II and the S9 machine.

    To Power an S9 or AirSense™/AirCurve™ 10 Machine on the ResMed Power Station:
    • Select "24v" output on the back panel of the ResMed Power Station
    • Connect the S9 Series DC Cable for ResMed Power Station (RPS) II or AirSense™/AirCurve™ 10 Series DC Cable for ResMed Power Station (RPS) II to the ResMed Power Station
    • Remove the cap from the other end of the S9 or the AirSense™/AirCurve™ 10 Series DC Cable for ResMed Power Station
    • Connect the uncapped end of the S9 or the AirSense™/AirCurve™ 10 Series DC Cable for ResMed Power Station to the S9 or AirSense™/AirCurve™ 10 machine in the port, where the power cord is normally connected to the machine
    • Turn on the ResMed Power Station
    • Turn the S9 or AirSense™/AirCurve™ 10 machine on as normal

    To Charge the ResMed Power Station:

    • Connect the Power Supply Unit (PSU) Adapter for ResMed Power Station (RPS) II to the ResMed Power Station
    • Connect the External Power 90 Watt Supply for ResMed S9 Series Machines or the External Power 90 Watt Supply for ResMed AirSense™ 10/AirCurve™ 10 Series Machines to the PSU Adapter
    • Plug the S9 or the AirSense™ 10/AirCurve™ 10 Power Supply into an AC wall outlet
    • The "charging" light will show until the battery is fully charged
    • If unused, the battery MUST be recharged every three (3) months

    Depending on the machine being used, the Power Supply Unit (PSU) Adapter for S9 Machines for ResMed Power Station (RPS) II or the Power Supply Unit (PSU) Adapter for AirSense™ 10 and AirCurve™ 10 Machines for ResMed Power Station (RPS) II are required to charge the RPS II. The PSU connects the RPS II to both the S9 External Power Supply and the AirSense™ 10/AirCurve™ 10 Power Supply. The PSU for AirSense™ 10/AirCurve™ 10 machines is not included with this battery.

    The S9 Power Supply Unit and the AirSense™ 10/AirCurve™ 10 Power Supply Unit that come standard with all S9 or AirSense™ 10/AirCurve™ 10 machines are used to charge the ResMed Power Station II. The S9 power supply and the AirSense™ 10/AirCurve™ 10 power supply are not included with the battery.

    The manufacturer warranty for the ResMed Power Station II is 6 months.

    Recharging Requirement: When storing the ResMed Power Station, if it is unused for a period of THREE (3) months the battery MUST be recharged to maintain the functionality of the battery. Per the manufacturer, if the battery is not recharged it will eventually discharge completely and no longer be able to be recharged and there will not a way in which to recover the functionality of the battery.

    Please contact CPAP.com with questions. Call toll free: 1-800-356-5221 or email to cpap@cpap.com.



    Replacement Parts


    mgctlbxN$MZP mgctlbxV$5.2.5 mgctlbxL$C

    Live Support Chat